Circle - Wallstone (redo)
2006
Wednesday, September 27
In the morning, Tim demoed the first 2 course and places them around the site, so that it'd be easy to place them back. At the same time Tom's crew was there grading the top soil more.
When I had gotten home, Tim and I had taken a trip to Home Depot and purchased the cinder blocks for the bottom course. When we got back, we laid them out and repositioned the wallstone back in place, but this time, on top of the cinder blocks.
It was clear, when the stones were back in place, that it was the way to go. They were now at the right height to the grade of the driveway. I hated to redo everything, but sometimes it's for the best.
Wednesday, September 27
In the morning, Tim demoed the first 2 course and places them around the site, so that it'd be easy to place them back. At the same time Tom's crew was there grading the top soil more.
When I had gotten home, Tim and I had taken a trip to Home Depot and purchased the cinder blocks for the bottom course. When we got back, we laid them out and repositioned the wallstone back in place, but this time, on top of the cinder blocks.
It was clear, when the stones were back in place, that it was the way to go. They were now at the right height to the grade of the driveway. I hated to redo everything, but sometimes it's for the best.
Comments